"The lot was so bad we were losing tenants. Blacktop came in, assessed in one afternoon, and had us paved before the back-to-school rush."
— Ridgefield Commons Strip Mall, Schaumburg

Project Scope
Ridgefield Commons Strip Mall, Schaumburg
Ridgefield Commons had been patching the same failing sections for six years. The base had deteriorated under the northeast quadrant — freeze-thaw cycles had turned minor cracking into full-depth failure across 12,000 sq ft. Property manager Dan Kowalczyk needed the lot fully operational through a tenant's summer promotion window. We phased the work into three zones, milling and full-depth reclaiming the northeast first, then resurfacing the balance with 3-inch binder and 1.5-inch surface course. Drainage was regraded to eliminate the ponding that had accelerated the original failure. Striping was complete 48 hours after final compaction. Dan's exact words: "I didn't realize what a new lot looked like until now."